Rob
holding up a section of the lower staging. This was a piece saved
from the original layout
|
Michael
and Dustin putting together the first section of the benchwork on the
main train room
|
|
The
lower and top ends of staging. Each will have a loop going through
the wall
|
|
Lower
and upper staging in
|
|
Bill
and Ron bracing the lower staging
|
|
Rob
and Grant starting the lower staging benchwork
|
|
Lower
and Upper staging benchwork
|
Upper
and lower deck staging braced through the wall. This is where the
loop will go
|
Grant,
Bill and Rob building the lower deck staging
|
Another
view of upper and lower staging
|
John,
Michael and Dustin putting up the first bench work in the main train
room
|
John,
Michael and Dustin putting up the first bench work in the main train
room
|
Dustin
and Rob built the top level loop and braced the sections on the opposite
wall
|